Planning

How long does a roof replacement actually take?

What drives the timescale, and why any honest answer is a range rather than a date.

Every roof is different, and weather sits outside everybody's control. What a roofer can tell you is what drives the number.

What lengthens a job

  • Roof size and number of separate slopes
  • Steep pitch, which slows every single task
  • Complex details: valleys, dormers, chimneys, roof windows
  • Scaffold complexity and restricted access
  • Hidden timber repairs found during the strip
  • Weather — particularly wind, which stops work before rain does

A realistic shape

Scaffold goes up first, often a day or two ahead. The strip is usually the fastest and noisiest phase. Re-covering takes the bulk of the time. Details and leadwork come last, and they are the part it is worst to rush.

Ask for a range with the assumptions written down, rather than a single date. A single date usually means someone has not thought about the weather.